FILTER PROJECTS BY

Carrollwood/Dale Mabry Reclaimed Water Pump Station Replacement

Project Overview

Following large population growth in the northern neighborhoods of Hillsborough County, Florida, the county’s pump station began reaching its operating capacity. PCL’s Water Infrastructure Group in Tampa stepped in to replace the existing reclaimed water pump station with a larger, more modern facility that accommodated the County’s recent growth and allowed for future expansion. The Carrollwood/Dale Mabry Reclaimed Water Pump Station Replacement project included the installation of new vertical turbine pumps and associated systems, which are designed to operate more efficiently than the station’s original split-case centrifugal pumps. The new and improved pump station allows for a higher daily capacity of reclaimed water to be used for irrigation in Hillsborough County, thus reducing the load on the potable water system during dry seasons.

DETAILS

CLIENT:
County Of Hillsborough
PROJECT LOCATION:
Tampa, FL
PCL OFFICE:
Tampa – Civil Construction (Water Infrastructure)
COMPANY:
PCL Construction, Inc.
SECTOR:
Civil
MARKET:
Water and Wastewater Infrastructure
DELIVERY METHOD:
General Contracting