Flagler Memorial Bascule Bridge Replacement

Project Overview

This project consists of the complete replacement of an existing bascule bridge with a new four-lane divided urban-section bascule bridge. The proposed bridge’s typical section includes 12-foot travel lanes, 8-foot shoulders, and a 15.5-foot median. Sidewalks will be included along both sides of the new bridge, with a pedestrian/bicycle railing on the outside of the sidewalks.

The approach span superstructure will be comprised of prestressed concrete haunch bulb-T beams and haunched fascia beams. The approach spans will consist of 8.5-foot concrete decks, while the bascule spans will be concrete-filled exodermic decking. The new bascule spans will provide 21 feet of vertical clearance when closed, unlimited vertical clearance when open, and 125 feet of horizontal clearance between bridge fenders.

DETAILS

CLIENT:
Florida Department of Transportation, District 4 (FDOT)
PROJECT LOCATION:
West Palm Beach, FL
PCL OFFICE:
Raleigh – Civil Construction (Transportation Infrastructure)
COMPANY:
PCL Civil Constructors, Inc.
SECTOR:
Civil
MARKET:
Bridges
DELIVERY METHOD:
Design-Build