The MPL–400 Relocation project included the disassembly, transportation, and reassembly of equipment and piping for the 25-year-old Praxair Air Separation Unit from Praxair's Hatfield plant in Pennsylvania, USA, to Prentiss, Alberta. PCL Energy Inc. (formerly Monad Industrial Constructors Inc.) performed all mechanical equipment and piping installations, including two used nitrogen compressors, one used turbine, one used cold box, four sets of used coolers, and all interconnecting piping.

The final layout was significantly different than the original, presenting a logistical challenge, but the PCL Energy team worked diligently to reassemble the plant and have it operating with the required four-month schedule.