PCL : UE-1 Hydrogen Plant Pipe Fabrication
FILTER PROJECTS BY

UE-1 Hydrogen Plant Pipe Fabrication

Project Overview

This project consisted of the pipe fabrication for the UE-1 Technip Hydrogen Plant located at Syncrude's Plant 9-4 north of Fort McMurray, Alberta. The final fabrication scope of work was 32,000 diameter inches of module piping, plus 91,000 diameter inches of off-rack piping. The scope of work ranged from 3/4" to 42" nominal pipe size, and included carbon steel, stainless steel, and a large percentage of chrome fabrication.

The team was first awarded this project based on capacities demonstrated by PCL’s fabrication facility and module yard. Said capacities were not compromised despite extensive internal renovations that ran concurrent with this project, and the team fabricated piping for 300 modules without affecting the schedule. On completion, the team was awarded Syncrude's One Team — One Goal award, in recognition of their commitment to teamwork in the face of all challenges.

DETAILS

CLIENT:
Syncrude Canada Ltd.
PROJECT LOCATION:
Fort McMurray, AB
PCL OFFICE:
Edmonton – Industrial Fabrication
COMPANY:
PCL Industrial Constructors Inc.
SECTOR:
Industrial
MARKET:
Heavy Industrial
DELIVERY METHOD:
General Contracting

Awards

One Team - One Goal Award 2001 - 2004 - Syncrude Canada Ltd.