Project Description
The Ben Sawyer Swing Bridge Replacement is a Design/Build project that will consist of demolition and reconstruction of the 1,154' bridge superstructure. The new approach spans will be constructed on temporary bents and moved into position during a seven day closure period. The new 245' swing span will be floated into position during the same seven day closure.
|