|
|
|
|
|||||||||||||||||||||||||
Project Features/Highlights
- 62-ton overheade crane spanning 90'. Project Description
PCL Construction Management Inc. was sole sourced for the supply and erection of the pre-engineered metal building shell for this project due to the tight fast-track schedule. The entire building was erected in seven months with the majority of the erection being performed in the winter.
|
Contact
For similar projects contact:Owner |
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |