| 1 2 3 4 5 6 |
Search Results |
 |
77 King Street West Renovation Project
| Location: |
Toronto, ON |
| Description: |
Renovation to existing building |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
91st Ave WWTP Unified Plant Expansion 2005 - Project A Project No. WS90100079 (WS90100057)
| Location: |
Tolleson, AZ |
| Description: |
Transmit effluent water to the Tres Rios Wetlands project and to the ANPP Transmission line. |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Academic Health Sciences - E Wing - Univ of Saskatchewan
| Location: |
Saskatoon, SK |
| Description: |
Academic Health Sciences Teaching Facility at the University of Saskatchewan |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Alaska Railroad Corporation Historic Depot Rehabilitation
| Location: |
Anchorage, AK |
| Description: |
Restoration of 1942 art deco railroad depot. |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Amtrak - New Cascades Maintenance Facility (Phase 1) and New Warehouse, Administrative, Health and Welfare Building (Phase 2)
| Location: |
Seattle, WA |
| Description: |
Railroad maintenance and administrative office facilities. |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
ANC South Terminal Seismic and Security Retrofit Phase 2
| Location: |
Anchorage, AK |
| Description: |
Seismic/Security Retrofit and Remodel of Airport Terminal. |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Anthony Henday Drive and Stony Plain Road (100 Avenue) Interchange
| Location: |
Edmonton, AB |
| Description: |
Interchange - road work and bridge |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
AOSP Downstream Expansion - RHC Unit
| Location: |
Fort Saskatchewan, AB |
| Description: |
Construction of a Residue Hydro Conversion, Integrated Hydro Treatment Unit (RHC) which is the main process unit within the Shell Canada Alberta Oil Sands Project |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Baldinger Bakery
| Location: |
St. Paul, MN |
| Description: |
Baldinger Bakery Food Production Facility |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
BC Cancer Agency Centre for the North
| Location: |
Prince George, BC |
| Description: |
New 2-storey Cancer Clinic. |
| Built By: |
PCL Constructors Westcoast Inc. |
| Delivery Method: |
[P3 (DBFO)] P3 Design Build Finance Operate |
|
|
 |
BC Place Roof - Phase 2
| Location: |
Vancouver, BC |
| Description: |
New retractable, cable stayed, fabric roof |
| Built By: |
PCL Constructors Westcoast Inc. |
| Delivery Method: |
[CMA] Construction Management - Agency |
|
|
 |
Ben Sawyer Swing Bridge Design-Build
| Location: |
Charleston, SC |
| Description: |
Superstructure replacement of the Ben Sawyer Swing Bridge |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Biltmore Antler Hill Village
| Location: |
Asheville, NC |
| Description: |
Winery Village expansion with shops, restaurants and exhibit hall. |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Block 26 West Condominiums
| Location: |
Toronto, ON |
| Description: |
high rise condominium construction |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Block 26E Luna Condominiums
| Location: |
Toronto, ON |
| Description: |
two condominium towers: 38-storeys and 18-storeys, 2 levels underground parking, amenities area, outdoor water feature |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Bob Hope Patriotic Hall Renovation
| Location: |
Los Angeles, CA |
| Description: |
Design/Build contract for renovation of 10 story building |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Bridgepoint Hospital Redevelopment
| Location: |
Toronto, ON |
| Description: |
New 780,000 SF complex care facility, restoration of historic Don Jail and demolition of existing hospital and Toronto Jail |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
[P3 (DBFO)] P3 Design Build Finance Operate |
|
|
 |
Bridgeview Pump Station
| Location: |
Surrey, BC |
| Description: |
Sewer system upgrade and replacement of existing pump station |
| Built By: |
PCL Constructors Westcoast Inc. |
|
|
|
|
 |
Building 1 Extension - NIST Campus
| Location: |
Boulder, CO |
| Description: |
Advanced Testing Laboratory for the National Institute of Standards and Technology (NIST) |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Burnhamthorpe Library
| Location: |
MIssissauga, ON |
| Description: |
The Burhamthorpe Library project involves the renovation of the entire building and addition to the Dixie/Bloor Neighborhood Service. |
| Built By: |
PCL Constructors Canada Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
| |
| 1 2 3 4 5 6 |