| 1 2 3 4 5 6 |
Search Results |
 |
#4 Hydrotreater - Civil & Mechanical
Location: |
Ponca City, OK |
Description: |
Civil & Mechanical for the #4 Hydrotreater |
Built By: |
Teton Industrial Construction, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
2004 Strathcona Shutdown
Location: |
Edmonton, AB |
Description: |
Shutdown and mechanical maintenance work in Complexes A, S & C at the existing Imperial Oil, Strathcona Refinery facility. |
Built By: |
Melloy Industrial Services Inc. |
|
|
|
|
 |
24Z Casing Gas Compressor Station
Location: |
Tupman, CA |
Description: |
12-in gathering system with three 1200 HP engine drive compressors |
Built By: |
PCL Industrial Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
35R GTU Facility Construction Project
Location: |
Tupman, CA |
Description: |
Fabrication of a Gas Treatment Unit |
Built By: |
PCL Industrial Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
3G Compressor & Equipment Foundations
Location: |
Tupman, CA |
Description: |
Concrete Foundations |
Built By: |
PCL Industrial Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
400 Tank Farm, Phase 1 Pipe Fabrication
Location: |
Edmonton, AB |
Description: |
Pipe fabrication for a 200,000 barrel capacity refinery tank farm |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
400 Tank Farm, Phase I
Location: |
Edmonton , AB |
Description: |
Construction of a new 200,000 barrel capacity refinery tank farm and the demolition of existing facilities |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
777 Project - Zinc Plant Expansion
Location: |
Flin Flon, MB |
Description: |
New Tankhouse
|
Built By: |
PCL Constructors Canada Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Argus to Westend Steam Line
Location: |
Trona, CA |
Description: |
Installation of 26,000 lineal feet of 12" steam and 6" condensate pipeline on supports. |
Built By: |
PCL Industrial Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Aurora Mine Project
Location: |
Fort McMurray, AB |
Description: |
30,000 BPD oil sands extraction facility |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Block 80 Cell Area Shutdown
Location: |
Fort Saskatchewan, AB |
Description: |
Petrochemical plant shutdown |
Built By: |
|
|
|
|
|
 |
Box Reformer Hydrogen Unit - 80 SCFD Civil & Underground
Location: |
El Segundo, CA |
Description: |
Installation of all civil and underground work associated with the erection of an 80 SCFD Hydrogen Plant |
Built By: |
Teton Industrial Construction, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
BreitBurn Town Lot Accommodation Project
Location: |
Santa Fe Springs, CA |
Description: |
Modification of an existing oilfield. |
Built By: |
PCL Industrial Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Buena Vista Landfill LFGTE
Location: |
Watsonville, CA |
Description: |
mechanical/piping install of three gensets and associated equipment |
Built By: |
PCL Industrial Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Calgary Energy Centre
Location: |
Calgary, AB |
Description: |
250 MW combined cycle power plant |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Calgary Energy Centre Building
Location: |
Balzac, AB |
Description: |
Supply and Erection of Pre-engineered Metal Building Shell. |
Built By: |
PCL Construction Management Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Calgary Energy Centre Pipe Fabrication
Location: |
Calgary, AB |
Description: |
Pipe fabrication of approximately 30,000 units for a 250 MW combined cycle power plant |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Chlorides Management Facilities
Location: |
Mildred Lake, AB |
Description: |
Installation of two new Inclined Plate Settlers (IPS) complete with ancillary work to tie the new units into the existing extraction process |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
CMEC Biomass Gasification Project
Location: |
Little Falls, MN |
Description: |
Construction of a biomass gasification process for an existing ethanol facility. |
Built By: |
PCL Construction Services, Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
CNRL Horizon Early Works
Location: |
Fort McKay, AB |
Description: |
Construction of a concrete structure for a delayed coker unit and a diluent recovery unit |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
| |
| 1 2 3 4 5 6 |