The Combined Residential and Commercial Recycling Facility project called for the demolition of the old facility and replacement of it with a new, 141,000-square-foot preengineered metal building.
The scope of work also includes, but is not limited to, a storm-water management system, administration offices, a truck scale, an employee break room and courtyard, trucking areas around the facility, and new sorting equipment.
PCL was a major contributor to forming the design-build team for this project. PCL was able to self-perform 20 percent of the work, which contributed to cost savings for the client; providing budgeting services beyond the contracted scope helped the client to investigate various needs.