OG&E Sooner Units 1 & 2

Project Overview

PCL Industrial Construction Co. provided EPC services for an air quality control system (AQCS) for two 570 MW coal-fired units retrofitted to reduce emissions of sulfur dioxide (SO2) based on Best Available Retrofit Technology (BART). The dry FGD system included circulating dry scrubbers, pulse jet fabric filters, storage and transfer equipment, lime hydration equipment, byproduct recycle handling equipment, and FGD waste-handling equipment. New ductwork, steel, and ID fans were installed to integrate the new AQCS equipment with the existing electrostatic precipitator and exhaust ducts.

DETAILS

CLIENT:
OGE Energy Corp
PROJECT LOCATION:
Red Rock, OK
PCL OFFICE:
Houston – Industrial Construction
COMPANY:
PCL Industrial Construction Co.
SECTOR:
Industrial
MARKET:
Heavy Industrial
DELIVERY METHOD:
Engineer Procure Construct (EPC)